|
Sports field will be under maintenance from 7-10-2017 to 8-25-2017 due to the ground leveling and turf repairing.
|
2017-06-29 |
|
The shelter, near to the flower stand on east side will be constructed.
|
2017-06-23 |
|
Tuition Fee Information
|
2017-06-22 |
|
Li-Hsueh building (4F) will be constructed.
|
2017-05-27 |
|
Facade of Li-Hsueh will be constructed.
|
2017-05-27 |